A-1Fast-Casual & QSR · Los Angeles
Fast-Casual Restaurant Seating, Built for Turnover
Fast-casual seating fails differently than fine dining. It is not about comfort over two hours — it is about surviving forty covers a day per seat, for years, and looking identical in unit twelve as it did in unit one.
- 1About 2 business days to a firm, itemized quote
- 2Shop drawings included, approved before anything is cut
- 34–10 weeks from approved drawings · delivered and installed nationwide
Seating built for
Fast-Casual Seating
Unit twelve has to match unit one — that is the entire discipline of fast-casual seating, and it is why rollout operators buy from a factory instead of a catalog. Fast-casual is a different engineering problem from full-service dining: seats turn over constantly, tables get wiped down dozens of times a day, footprints are tight, and the spec has to be repeatable across locations that may open years apart. We build bench runs, booths, stools, and dining chairs to your floor plan — fabricated, upholstered, and finished in-house — with drawings archived so unit fifteen matches unit one exactly. CAD and shop drawings come with every project.
Upholstered in Carson and shipped to fast-casual and QSR operators nationwide — phased to your opening calendar, from a single test unit to a full rollout.
Sheet A-3
General notes
- Bench & Banquette Runs: The most seats per square foot. Built per linear foot to your plan, straight or wrapped, with wipe-clean surfaces throughout.
- Turnover-Rated Construction: Hardwood frames and higher-density fills specified for constant cycling, not occasional use — the seat should outlive the fit-out.
- Cleanable Materials: High-double-rub, cleanable-code upholstery and sealed finishes that survive daily sanitising without going chalky or cracking.
- Repeatable Across Units: Your drawings stay on file. Reorder the identical spec for the next opening, in the same finish, years later.
- Tight Footprints: Dimensioned to your plan when a catalog size would cost you a row of seats or fail an egress width.
- Phased Openings: We build to a rollout calendar rather than dumping every unit at once, so nothing sits in storage racking up fees.
Built forFast-Casual ChainsQSRCoffee & CafeFood HallsGhost Kitchens & PickupCampus & Corporate Dining
Start with your drawingsFrom your drawings to your floor
- 01
Send the drawings
Plans, elevations, a spec, or a sketch with dimensions, with quantities and finishes.
- 02
Firm, itemized quote
Usually in about 2 business days, with the lead time committed.
- 03
Approve shop drawings
Every dimension and the COM/COL yardage confirmed before anything is cut.
- 04
Built in Carson
4–10 weeks from approved drawings or fabric receipt.
- 05
Delivered and installed
Nationwide, or carton and palletized freight to your site or receiver.
Send the drawings. Get a firm number.
Attach whatever you have. We read it, ask what we need, and return a firm, itemized quote with the lead time, usually in about 2 business days.
- Plans, elevations, a spec sheet, or a sketch with dimensions
- Quantities, and the fabric, leather or finish you have in mind
- The project city and your target date
Or call (310) 817-5489
Off our floor, into the room.
Real installs, not renderings. Tap a photo to enlarge.
Questions buyers ask first
Something not covered here? Call (310) 817-5489 and ask us directly.
Can you match seating across multiple locations?
Yes — that is the core of fast-casual work. Your approved drawings and finish specs stay on file, so a unit opening two years from now gets the identical build, not the closest current match.
How is fast-casual seating built differently from fine dining?
Cycles. A fast-casual seat may turn over forty times a day against a handful for fine dining, so it gets higher-density fills, reinforced frames at the stress points, and cleanable materials rated for daily sanitising.
Do you build for phased rollouts?
Yes. We build to your opening calendar rather than producing every unit at once, which keeps furniture out of paid storage and matches spend to the schedule.
What is the lead time for a multi-unit order?
Typically 4–10 weeks from approved shop drawings or fabric receipt for the first unit. Repeat units off an approved spec usually move faster because the engineering is already done.
Can you work to a tight floor plan?
Yes — everything is built to your dimensions. Send the plan and we will engineer the seat count around egress widths, aisle clearances, and column positions.
Do you provide CAD drawings?
Yes. CAD and shop drawings are produced and sent for your approval before anything is cut, and they are included with the project.
Is there a minimum order?
No. A single test unit is a real order, and it is usually the smart way to prove a spec before a rollout.
How do I get a price?
Send the floor plan, the piece counts, and your material — or just a photo and rough dimensions. We return a firm, itemized quote, usually within about two business days.
Have drawings, a spec, or a photo of the piece?
Send it today. A firm quote, itemized by piece and quantity, comes back in about 2 business days.





